Going UpWhat’s being built in Waterloo Region

Going Up › Kitchener › A 2004-085

A 2004-085

ApprovedCommittee of Adjustment · Kitchener

File number
A 2004-085
Type
Committee of Adjustment · SINGLE DETACHED
Status
Approved
Filed
2004-10-29
First seen here
2026-11-01

Description

To permit a side yard setback for a new carport to be 0.5 metres from the easterly property line instead of 1.2 metres setback.

What this kind of application is

The Committee of Adjustment decides minor variances (small exceptions to the zoning by-law, such as a reduced setback or an extra unit) and consents (severing a lot, or adding an easement). Nearby owners are mailed a notice and can speak at the hearing.

History

  1. 2026-11-01
    First seen in Kitchener’s open data. Going Up saves the city list every day and records each change from here on.

Nearby applications

  1. 86 FLORENCE AVEDC25/030/F/AA
    IssuedDemolition Control · filed 2025-11-10 · next door
  2. 132 FAIRWAY RD NDC26/016/F/AA
    IssuedDemolition Control · filed 2026-06-17 · 315 m away
  3. 74 Rutherford DrA 2021-116
    DeferredCommittee of Adjustment · DUPLEX · filed 2021-10-04 · 370 m away
  4. 74 Rutherford DrA 2021-117
    DeferredCommittee of Adjustment · DUPLEX · filed 2021-10-04 · 370 m away
  5. 2980 KING ST EZBA24/014/K/ES
    PassedZoning By-Law Amendment · filed 2024-05-28 · 384 m away
  6. 2980 KING ST EOPA24/008/K/ES
    RecommendationOfficial Plan Amendment · filed 2024-05-28 · 388 m away
  7. 32 WINDOM RDZBA23/037/W/ES
    PassedZoning By-Law Amendment · filed 2023-11-20 · 496 m away
  8. 142 FERGUS AVEZBA22/002/F/BB
    Issue ReviewZoning By-Law Amendment · filed 2022-01-19 · 578 m away