Going Up › Cambridge › Allendale Road › 475 Allendale Rd
475 Allendale Rd
ApprovedSite Plan Amendment · Cambridge
- File number
- SP01/26
- Type
- Site Plan Amendment
- Status
- Approved
- Filed
- 2026-01-06
- Proposed use
- Industrial
- First seen here
- 2026-11-01
Description
Proposing to connect the existing north south driveway on our Phase 2 lands, to our existing industrial development. The work includes removing the existing driveway, regrading, repaving and widening the new driveway. Stormwater infrasrtucture is also proposed within the driveway to manage flows and direct them to the ditch along Maple Grove. The culvert under our existing driveway connection to Maple Grove will be replaced and the curb radii for that access will be increased to better accommodate school buses, fire and transport trucks.
What this kind of application is
Site plan review is a technical review by city staff of how a building sits on its lot: layout, parking, driveways, landscaping, grading and servicing. There is usually no public meeting.
History
- 2026-11-01