Going UpWhat’s being built in Waterloo Region

Going Up › Kitchener › A 2003-076

A 2003-076

ApprovedCommittee of Adjustment · Kitchener

File number
A 2003-076
Type
Committee of Adjustment · SINGLE DETACHED
Status
Approved
Filed
2003-10-08
First seen here
2026-11-01

Description

To construct a single family dwelling and attached garage with a setback from Lackner Boulevard of 6m (19.69 ft.) rather than 12 m (39.37 ft.).

What this kind of application is

The Committee of Adjustment decides minor variances (small exceptions to the zoning by-law, such as a reduced setback or an extra unit) and consents (severing a lot, or adding an easement). Nearby owners are mailed a notice and can speak at the hearing.

History

  1. 2026-11-01
    First seen in Kitchener’s open data. Going Up saves the city list every day and records each change from here on.

Nearby applications

  1. 100 Chicopee Hills DriveA 2026-065
    Under ReviewCommittee of Adjustment · SCHOOL · filed 2026-09-30 · 653 m away
  2. A 2002-009A 2002-009
    ApprovedCommittee of Adjustment · SINGLE DETACHED · filed 2002-01-03 · 233 m away
  3. A 2005-002A 2005-002
    Appr w/o ConditionsCommittee of Adjustment · SINGLE DETACHED · filed 2005-01-11 · 274 m away
  4. 15 Zeller DrA 2006-001
    ApprovedCommittee of Adjustment · STREET TOWNHOUSE · filed 2005-12-21 · 384 m away
  5. 15 Zeller DrA 2006-021
    ApprovedCommittee of Adjustment · STREET TOWNHOUSE · filed 2006-02-21 · 384 m away
  6. 17 Zeller DrA 2006-022
    ApprovedCommittee of Adjustment · STREET TOWNHOUSE · filed 2006-02-21 · 386 m away
  7. 98 Corfield DrA 2010-036
    Appr-Cond MetCommittee of Adjustment · SINGLE DETACHED · filed 2010-06-01 · 394 m away
  8. 106 Idle Creek DrA 2019-002
    Appr-Cond MetCommittee of Adjustment · STREET TOWNHOUSE · filed 2019-01-07 · 422 m away