Going UpWhat’s being built in Waterloo Region

Going Up › Kitchener › A 2003-063

A 2003-063

ApprovedCommittee of Adjustment · Kitchener

File number
A 2003-063
Type
Committee of Adjustment · TRIPLEX
Status
Approved
Filed
2003-07-23
First seen here
2026-11-01

Description

To legalize an attached garage with a rear yard of 6.156 m (20.2 ft.) rather than the required 7.5 m (24.6 ft.).

What this kind of application is

The Committee of Adjustment decides minor variances (small exceptions to the zoning by-law, such as a reduced setback or an extra unit) and consents (severing a lot, or adding an easement). Nearby owners are mailed a notice and can speak at the hearing.

History

  1. 2026-11-01
    First seen in Kitchener’s open data. Going Up saves the city list every day and records each change from here on.

Nearby applications

  1. 501 KRUG STOPA26/006/K/EW
    In Circulation Scheduled MeetingOfficial Plan Amendment · filed 2026-05-15 · 340 m away
  2. 501 KRUG STZBA26/005/K/EW
    ApplicationZoning By-Law Amendment · filed 2026-05-15 · 341 m away
  3. 47 BELLEVIEW AVEDC26/032/B/TZ
    IssuedDemolition Control · filed 2026-10-13 · 542 m away
  4. 631 FREDERICK STDC26/021/F/TZ
    IssuedDemolition Control · filed 2026-07-29 · 914 m away
  5. 831 Frederick StreetA 2026-061
    Under ReviewCommittee of Adjustment · COMMERCIAL · filed 2026-09-30 · 984 m away
  6. 158 Donald StA 2017-129
    Appr w/o ConditionsCommittee of Adjustment · SEMI-DETACHED · filed 2017-12-08 · 185 m away
  7. 186 Lyndhurst DriveA 2023-122
    Appr-Cond MetCommittee of Adjustment · SINGLE DETACHED ADU · filed 2023-10-02 · 189 m away
  8. 156 & 158 Donald StB 2017-050
    EndorsedCommittee of Adjustment · SEMI-DETACHED · filed 2017-12-08 · 191 m away