Going UpWhat’s being built in Waterloo Region

Going Up › Kitchener › A 2003-023

A 2003-023

ApprovedCommittee of Adjustment · Kitchener

File number
A 2003-023
Type
Committee of Adjustment · COMMERCIAL-RES
Status
Approved
Filed
2003-03-25
First seen here
2026-11-01

Description

To permit a carwash with 2 vehicle waiting spaces for each bay rather than the required 4 spaces, and 2 spaces per bay for dry-off, wiping and vacuuming rather than the required 3 spaces.

What this kind of application is

The Committee of Adjustment decides minor variances (small exceptions to the zoning by-law, such as a reduced setback or an extra unit) and consents (severing a lot, or adding an easement). Nearby owners are mailed a notice and can speak at the hearing.

History

  1. 2026-11-01
    First seen in Kitchener’s open data. Going Up saves the city list every day and records each change from here on.

Nearby applications

  1. 34 MOORE AVEDC26/023/M/AA
    IssuedDemolition Control · filed 2026-08-11 · 240 m away
  2. 67 WELLINGTON ST NDC26/031/W/TZ
    IssuedDemolition Control · filed 2026-09-29 · 255 m away
  3. 50 Victoria Street NorthA 2026-070
    Under ReviewCommittee of Adjustment · COMMERCIAL · filed 2026-10-22 · 337 m away
  4. 81 SHANLEY STDC26/020/S/TZ
    IssuedDemolition Control · filed 2026-07-29 · 371 m away
  5. 95 SHANLEY STDC26/019/S/TZ
    IssuedDemolition Control · filed 2026-07-29 · 393 m away
  6. 69 Agnes StA 2003-061
    Cond Not FulfilledCommittee of Adjustment · RECREATIONAL · filed 2003-07-23 · 416 m away
  7. 44 BRAUN STDC26/018/B/TZ
    IssuedDemolition Control · filed 2026-07-29 · 538 m away
  8. 83 Victoria Street NorthB 2023-002
    CA DecisionCommittee of Adjustment · COMMERCIAL · filed 2023-01-04 · 567 m away