A 2017-097 - 95 Hollybrook Trail Permission to construct a cluster townhouse development having 51 off-street parking spaces (1.41 spaces/unit) rather than the required 63 off-street parking spaces (1.75 spaces/unit); and, a Floor Space Ratio (FSR) of 0.75 rather than the permitted maximum FSR 0.6.
What this kind of application is
The Committee of Adjustment decides minor variances (small exceptions to the zoning by-law, such as a reduced setback or an extra unit) and consents (severing a lot, or adding an easement). Nearby owners are mailed a notice and can speak at the hearing.