Going UpWhat’s being built in Waterloo Region

Going Up › Kitchener › Frey Crescent › 95 Frey Cres

95 Frey Cres

Appr-Cond MetCommittee of Adjustment · Kitchener

File number
A 2017-073
Type
Committee of Adjustment · SINGLE DETACHED
Status
Appr-Cond Met
Filed
2017-08-02
First seen here
2026-11-01

Description

A 2017-073 - 95 Frey Crescent Permission to construct a roof over an existing patio in the rear yard of an existing single detached dwelling having a rear yard setback of 4m rather than the required 7.5m.

What this kind of application is

The Committee of Adjustment decides minor variances (small exceptions to the zoning by-law, such as a reduced setback or an extra unit) and consents (severing a lot, or adding an easement). Nearby owners are mailed a notice and can speak at the hearing.

History

  1. 2026-11-01
    First seen in Kitchener’s open data. Going Up saves the city list every day and records each change from here on.

Nearby applications

  1. 1385 BLEAMS RDZBA24/004/B/BB
    RecommendationZoning By-Law Amendment · filed 2024-02-09 · 389 m away
  2. 1525 BLEAMS RDZBA22/004/B/TS
    PassedZoning By-Law Amendment · filed 2022-02-01 · 430 m away
  3. 75 Tillsley DrCC 2020-001
    CA DecisionCommittee of Adjustment · INSTITUTIONAL · filed 2020-06-01 · 649 m away
  4. 1295 BLEAMS RDZC17/003/F/AP
    PassedZoning By-Law Amendment · filed 2017-03-22 · 701 m away
  5. 1295 BLEAMS RDZBA20/008/F/AP
    PassedZoning By-Law Amendment · filed 2020-06-18 · 705 m away
  6. 23 Donnenwerth DriveA 2026-073
    Under ReviewCommittee of Adjustment · SEMI-DETACHED · filed 2026-10-22 · 733 m away
  7. 92 Frey CresA 2015-085
    Appr-Cond MetCommittee of Adjustment · SINGLE DETACHED · filed 2015-11-30 · next door
  8. 275 Max Becker DrA 2013-016
    Appr w/o ConditionsCommittee of Adjustment · MULTIPLE · filed 2013-02-22 · 107 m away

All applications on Frey Crescent →