Going UpWhat’s being built in Waterloo Region

Going Up › Kitchener › Block Line Road › 695 Block Line Rd

695 Block Line Rd

Appr-Cond MetCommittee of Adjustment · Kitchener

File number
A 2021-102
Type
Committee of Adjustment · INSTITUTIONAL
Status
Appr-Cond Met
Filed
2021-08-30
First seen here
2026-11-01

Description

A 2021-102 - 695 Block Line Road Permission to construct a 3-storey addition on an existing 5-storey institutional building having a building height greater than 14m without the required minimum street line stepback of 3m.

What this kind of application is

The Committee of Adjustment decides minor variances (small exceptions to the zoning by-law, such as a reduced setback or an extra unit) and consents (severing a lot, or adding an easement). Nearby owners are mailed a notice and can speak at the hearing.

History

  1. 2026-11-01
    First seen in Kitchener’s open data. Going Up saves the city list every day and records each change from here on.

Nearby applications

  1. 75 Tillsley DrCC 2020-001
    CA DecisionCommittee of Adjustment · INSTITUTIONAL · filed 2020-06-01 · 191 m away
  2. (1000 WESTMOUNT RD E)SG 2005-008
    Appr w/o ConditionsCommittee of Adjustment · INSTITUTIONAL · filed 2005-07-28 · next door
  3. 75 Tillsley DrB 2019-011
    Appr with ConditionsCommittee of Adjustment · INSTITUTIONAL · filed 2019-04-01 · 191 m away
  4. 75 Tillsley DriveB 2021-060
    EndorsedCommittee of Adjustment · INSTITUTIONAL · filed 2021-11-06 · 191 m away
  5. 23 Bosworth CrescentA 2022-108
    Appr w/o ConditionsCommittee of Adjustment · SINGLE DETACHED · filed 2022-08-30 · 289 m away
  6. 126 Julia CresA 2013-034
    Appr w/o ConditionsCommittee of Adjustment · SINGLE DETACHED · filed 2013-06-24 · 290 m away
  7. 130 Julia CresA 2016-032
    Appr with ConditionsCommittee of Adjustment · SINGLE DETACHED · filed 2016-05-11 · 303 m away
  8. 1170 Fischer Hallman RdA 2013-028
    Appr-Cond MetCommittee of Adjustment · COMMERCIAL · filed 2013-05-07 · 305 m away

All applications on Block Line Road →