Going UpWhat’s being built in Waterloo Region

Going Up › Kitchener › Shoemaker Street › 244-260 Shoemaker St

244-260 Shoemaker St

Appr-Cond MetCommittee of Adjustment · Kitchener

File number
A 2019-042
Type
Committee of Adjustment · INDUSTRIAL
Status
Appr-Cond Met
Filed
2019-05-02
First seen here
2026-11-01

Description

A 2019-042 - 244 and 260 Shoemaker Street Permission to construct a rear yard addition on an existing general industrial employment building having a rear yard setback of 1.18m rather than the required 7.5m.

What this kind of application is

The Committee of Adjustment decides minor variances (small exceptions to the zoning by-law, such as a reduced setback or an extra unit) and consents (severing a lot, or adding an easement). Nearby owners are mailed a notice and can speak at the hearing.

History

  1. 2026-11-01
    First seen in Kitchener’s open data. Going Up saves the city list every day and records each change from here on.

Nearby applications

  1. 244 & 280 Shoemaker StB 2016-028
    EndorsedCommittee of Adjustment · INDUSTRIAL · filed 2016-08-03 · next door
  2. 360 Trillium DrB 2008-025
    EndorsedCommittee of Adjustment · INDUSTRIAL · filed 2008-07-29 · 293 m away
  3. 55 Shoemaker StreetA 2025-063
    Appr w/o ConditionsCommittee of Adjustment · INDUSTRIAL · filed 2025-06-19 · 372 m away
  4. 40 Adam Ferrie Place / 60 Steckle PlaceB 2013-003
    EndorsedCommittee of Adjustment · INDUSTRIAL · filed 2012-12-20 · 380 m away
  5. 190 Century Hill DrA 2015-039
    CancelledCommittee of Adjustment · CLUSTER TOWNHOUSE · filed 2015-05-12 · 473 m away
  6. 1535 Strasburg RdA 2012-064
    Appr w/o ConditionsCommittee of Adjustment · INDUSTRIAL · filed 2012-08-28 · 523 m away
  7. 1535 Strasburg RdB 2012-028
    EndorsedCommittee of Adjustment · INDUSTRIAL · filed 2012-08-29 · 523 m away
  8. 269 Trillium DrB 2019-059
    EndorsedCommittee of Adjustment · INDUSTRIAL · filed 2019-08-29 · 527 m away

All applications on Shoemaker Street →