125 Maple Grove Rd
ApprovedRedline Revision · Cambridge
- File number
- SP21/20
- Type
- Redline Revision
- Status
- Approved
- Filed
- 2020-05-19
- Proposed use
- Distribution Terminal/Delivery Station
- First seen here
- 2026-11-01
Description
The proposal includes minor revisions to the existing site layout and building. Work will include re-surfacing of the existing asphalt paving, new parking layouts to accommodate both staff parking and delivery van parking. Two exterior overhead doors will be added to the existing building to accommodate our operations and new signage will be installed.
What this kind of application is
A redline revision changes a plan of subdivision that already has draft approval, such as moving lot lines or a road.